Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the impeka domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/klient.dhosting.pl/pekabex/backup/BK-pekabex.com/wp-includes/functions.php on line 6131

Warning: Cannot modify header information - headers already sent by (output started at /home/klient.dhosting.pl/pekabex/backup/BK-pekabex.com/wp-includes/functions.php:6131) in /home/klient.dhosting.pl/pekabex/backup/BK-pekabex.com/wp-includes/feed-rss2.php on line 8
Power industry objects | Pekabex - budownictwo prefabrykowane https://test.pekabex.com/en/realizations/power-industry-objects/ Sun, 06 Feb 2022 05:55:41 +0000 en-US hourly 1 https://wordpress.org/?v=6.9.4 https://test.pekabex.com/wp-content/uploads/2022/02/cropped-favicon-32x32.png Power industry objects | Pekabex - budownictwo prefabrykowane https://test.pekabex.com/en/realizations/power-industry-objects/ 32 32 FILBORNA POWER PLANT IN HELSINGBORG, SWEDEN https://test.pekabex.com/en/realizations/power-industry-objects/filborna-power-plant-in-helsingborg-sweden/ Sun, 06 Feb 2022 05:55:41 +0000 https://pekabex.pl/?p=10019 The structure which we are especially proud of is Filborna power plant in Helsingborg in Sweden. Total number of prefabricated elements manufactured, delivered, and installed by Pekabex was 4,108 pieces, […]

Artykuł FILBORNA POWER PLANT IN HELSINGBORG, SWEDEN pochodzi z serwisu Pekabex - budownictwo prefabrykowane.

]]>
The structure which we are especially proud of is Filborna power plant in Helsingborg in Sweden. Total number of prefabricated elements manufactured, delivered, and installed by Pekabex was 4,108 pieces, and their repeatability was very low. Total volume of the structure was 6,840 m3. Installation of that very complicated structure lasted continuously for 13 months with works realized at large heights.
Efficient operation of the design department, very complicated design, and realization of hanging staircases were the biggest challenges in that project. We have designed and installed those prefabricated elements. The elements have been perfectly fitted which for 45-metre hanging staircase is a success of designers, producer, and installers.

Artykuł FILBORNA POWER PLANT IN HELSINGBORG, SWEDEN pochodzi z serwisu Pekabex - budownictwo prefabrykowane.

]]>
LNG TERMINAL IN ŚWINOUJŚCIE https://test.pekabex.com/en/realizations/power-industry-objects/lng-terminal-in-swinoujscie/ Sun, 06 Feb 2022 05:54:36 +0000 https://pekabex.pl/?p=10017 LNG terminal in Świnoujście is an investment of strategic importance for the national energetic safety, allowing for receiving and regasification of liquid natural gas. Our works at the construction site […]

Artykuł LNG TERMINAL IN ŚWINOUJŚCIE pochodzi z serwisu Pekabex - budownictwo prefabrykowane.

]]>
LNG terminal in Świnoujście is an investment of strategic importance for the national energetic safety, allowing for receiving and regasification of liquid natural gas. Our works at the construction site lasted from February 2012 to November 2013. The Pekabex range of works included realization of concrete substructures for the prefabricated structure of eleven pipeline trestles, consisting of foundation footings, columns, two levels of beams, and prefabricated channels. Pekabex has also realized the foundation for recondenser, BOG Compressor, and the monolithic foundations.
The range of our works included manufacturing and delivery of the following prefabricated elements: 682 pieces of reinforced foundations and sockets, 292 pieces of foundations for the lighting posts, 685 pieces of reinforced columns, 9 column footings (security building on the breakwater), 25 pieces of walls on foundations, 26 pieces of walls forming the side channels, 15 pieces of ground beams and walls (security building on the breakwater), 3596 pieces of U-channels, 298 pieces of cable channels and lids for those channels, 750 pieces of reinforced beams and transoms, 137 pieces of beams on the tanks. We have manufactured 10,895.38 m3 for that investment in total.

Artykuł LNG TERMINAL IN ŚWINOUJŚCIE pochodzi z serwisu Pekabex - budownictwo prefabrykowane.

]]>