PARKING PLACE RAILWAY STATION IN POZNAŃ
Object constructed for Euro 2012. Constructed on time despite very cold winter. Works have been realized even in temperatures of 15 Celsius degrees below zero. Installation was very complicated as…
WIĘCEJimpeka domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/klient.dhosting.pl/pekabex/backup/BK-pekabex.com/wp-includes/functions.php on line 6131Object constructed for Euro 2012. Constructed on time despite very cold winter. Works have been realized even in temperatures of 15 Celsius degrees below zero. Installation was very complicated as…
WIĘCEJConstruction realized in 2012 by Pekabex in range of designing, manufacturing, delivery, and installation of prefabricated elements for Mota-Engil Central Europe S.A. company. Object consists of four levels and multi-leve;…
WIĘCEJWe manufacture prefabricated elements and build parking places. We have constructed from our prefabricated elements the overground parking place of skeletal reinforced concrete structure. Floor of 2-level parking place has…
WIĘCEJ