Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the impeka domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/klient.dhosting.pl/pekabex/backup/BK-pekabex.com/wp-includes/functions.php on line 6170
Prefabricated shells | Pekabex - budownictwo prefabrykowane

Prefabricated shells

Prefabricated shells

We have manufactured prefabricated shells and bottoms for the sewage collectors in Poznań in the sewage system modernization and expansion project.

 

The thickness of shells is 15 cm, radius 160 cm, thickness of bottom 25 cm.

 