Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the impeka domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/klient.dhosting.pl/pekabex/backup/BK-pekabex.com/wp-includes/functions.php on line 6131
AIRON BYDGOSZCZ | Pekabex - budownictwo prefabrykowane

AIRON BYDGOSZCZ

AIRON BYDGOSZCZ

In 2012 Pekabex has finished installation of production building with social and office facilities in Industrial Park in Bydgoszcz for Airon Investment company. The building has area of 6,000 m2. Range of realized works included production, delivery, and installation of prefabricated elements such as columns, girders, and overhead crane beams. Currently Pekabex has finished the installation of another building for the same investor. Therefore the plant from 2012 has been expanded with another production building with social and office facilities and umbrella roof adjacent to the hall

800 600 Pekabex - budownictwo prefabrykowane
Szukam...