Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the impeka domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/klient.dhosting.pl/pekabex/backup/BK-pekabex.com/wp-includes/functions.php on line 6131
DONALDSON SKARBIMIERZ | Pekabex - budownictwo prefabrykowane

DONALDSON SKARBIMIERZ

DONALDSON SKARBIMIERZ

For the construction of Donaldson filters factory in Skarbimierz near Brzeg Pekabex has manufactured, delivered, and installed the prefabricated carrying structure from concrete of volume of 1,092 m3, from which over a half was used for the roof structure. Besides the prestressed girders and trimmer beams we have also manufactured, delivered, and installed columns, ground beams, and HC slabs.

800 600 Pekabex - budownictwo prefabrykowane
Szukam...