Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the impeka domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/klient.dhosting.pl/pekabex/backup/BK-pekabex.com/wp-includes/functions.php on line 6131
FM LOGISTIC | Pekabex - budownictwo prefabrykowane

FM LOGISTIC

FM LOGISTIC

From September 2012 to June 2014 Pekabex has built 4 high storage warehouses for Fm Logistic company in total. Two of them are located in Olszowa (near Strzelce Opolskie), the other ones in Błonie (near Warsaw) and Tomaszów Mazowiecki. Moreover we have built accompanying objects: offices and technical facilities. Range of our works included design, production, transport, and installation of over 2,700 prefabricated elements in total, from foundation footings, through columns and walls, to girders and purlins. The most atypical work included realization of 5 decorative elements (made from white cement) for entry to the office building in form of 4 columns and slab for the roof. The slab has been manufactured in blue colour with use of appropriate pigment for concrete.

800 533 Pekabex - budownictwo prefabrykowane
Szukam...