Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the impeka domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/klient.dhosting.pl/pekabex/backup/BK-pekabex.com/wp-includes/functions.php on line 6131
NGK Ceramics Factory | Pekabex - budownictwo prefabrykowane

NGK Ceramics Factory

NGK Ceramics Factory

Extension of the second NGK Ceramics Polska ceramic filter plant.

Construction of the factory at ul. Jana Gutenberg 14 in Gliwice, took place from mid-October 2014. until mid-January 2015 The scope of our work included design, production, delivery and assembly of a prefabricated structure. In total, we installed over 1,300 prefabricated elements with a total volume of over 2,500.00 m3. A particular challenge in this investment was the production, delivery and assembly of 20 pieces of over 25 meters high poles of the production hall, which weighed over 35 tons each. The prefabricated staircases that we made on this site also deserve attention.

640 427 Pekabex - budownictwo prefabrykowane
Szukam...