Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the impeka domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/klient.dhosting.pl/pekabex/backup/BK-pekabex.com/wp-includes/functions.php on line 6131
SAMSUNG IN WRONKI | Pekabex - budownictwo prefabrykowane

SAMSUNG IN WRONKI

SAMSUNG IN WRONKI

Pekabex has realized complex works during construction of Samsung factory in Wronki – from earth works, through monolithic works (foundations, docks, concrete overlay), to the installation of steel structure. In range of prefabricated structure Pekabex has realized and installed 267 elements of total volume of approx. 468 m3. The prefabricated structure included columns, beams, girders, ground beams, and docks. The area of the whole object is approx. 5,000 m2.

800 600 Pekabex - budownictwo prefabrykowane
Szukam...