Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the impeka domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/klient.dhosting.pl/pekabex/backup/BK-pekabex.com/wp-includes/functions.php on line 6131
OVERPASS IN CZĘSTOCHOWA | Pekabex - budownictwo prefabrykowane

OVERPASS IN CZĘSTOCHOWA

OVERPASS IN CZĘSTOCHOWA

In range of realization of overpass in Częstochowa (crossing of national roads no. 1 and no. 46) Pekabex has manufactured prefabricated post-tensioned prestressed concrete beams for the overpass carrying structure of length from 22.6 to 26.0 m and weight from 60 to 69 tons, reinforced with 9.5 tons of ribbed steel and 1.5 tons of tensioning cables. Realization of the biggest weight in the company history has become possible thanks to equipping the existing hall with new overhead cranes 2 x 32 t and production lines for prestressed elements, allowing for combining the multiple tensioning sets when high total tensioning force is required – 9,200 kN (920 tons).

1024 683 Pekabex - budownictwo prefabrykowane
Szukam...