Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the impeka domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/klient.dhosting.pl/pekabex/backup/BK-pekabex.com/wp-includes/functions.php on line 6131
Linaberg 19 Residential Complex in Stockholm | Pekabex - budownictwo prefabrykowane

Linaberg 19 Residential Complex in Stockholm


Linaberg 19 Residential Complex in Stockholm

The Linaberg 19 project in Sweden is a residential complex consisting of 19 buildings with a total of 370 apartments. Pekabex was responsible for the design, production, delivery, and assembly of the prefabricated elements. The first phase of the investment included 12 buildings with a two-story garage, covering an area of approximately 80×90 meters. In our Gdańsk prefabrication plant, we produced columns, prestressed beams, solid walls, filigree slabs, balconies, stairs, as well as Half Sandwich and Sandwich walls (single, double, and triple-layered), painted, with matrices and factory-installed windows. A total of over 8,500 elements were used for the assembly.

The second phase included 7 buildings for the northern part of the investment.

The assembly work for the southern part took nearly 2 years, while deliveries for the northern part took about a year.

The design work for all 19 buildings took a total of 39,629 man-hours.