Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the impeka domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/klient.dhosting.pl/pekabex/backup/BK-pekabex.com/wp-includes/functions.php on line 6131
Havsbrynet Residential Complex in Malmö | Pekabex - budownictwo prefabrykowane

Havsbrynet Residential Complex in Malmö


Havsbrynet Residential Complex in Malmö

For the client Skanska, we constructed the Havsbrynet complex in Limhamn, Malmö.

Located directly by the sea, the project consists of 3 buildings with 148 apartments, commercial space, and an underground garage beneath the entire development.

2048 1365 Pekabex - budownictwo prefabrykowane
Szukam...