Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the impeka domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/klient.dhosting.pl/pekabex/backup/BK-pekabex.com/wp-includes/functions.php on line 6170
POZNAŃ CITY CENTER | Pekabex - budownictwo prefabrykowane

POZNAŃ CITY CENTER

POZNAŃ CITY CENTER

The object has been constructed on time despite very cold winter. Works have been realized even in temperatures of -15 Celsius degrees below zero. Installation was very complicated as the whole object is located above used railway tracks. Strictly installation works have been realized only during 5 night hours as only the railway power supply was turned off. The object included almost 500 prefabricated elements. Pekabex range included columns, beams, HC slabs, TT slabs, and floors steel structure. One of the interesting things is that some floors have been hydraulically lifted to their final position.

1024 640 Pekabex - budownictwo prefabrykowane
Szukam...