Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the impeka domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/klient.dhosting.pl/pekabex/backup/BK-pekabex.com/wp-includes/functions.php on line 6131
SELGROS IN WROCŁAW | Pekabex - budownictwo prefabrykowane

SELGROS IN WROCŁAW

SELGROS IN WROCŁAW

Selgros store at Krakowska Street in Wrocław of area of over 10,000 m2. Installation took approx. 2 months and the number of elements was over 600 pieces. The prefabricated structure included columns with projecting bars, beams, beams connected with monolithic nodes, girders, and TT slabs.